What a 14 kWp rooftop comes to
Twenty-two lines, generated from a traced roof. The ones marked estimated are where no Trade Partner lists the part yet.
From a layout to a priced bill
Four steps, and the first two happen on their own.
It generates
Every line the design implies, with amounts worked from the roof and the mounting method.
You price it
Pick catalogue products against the lines that matter, or leave the estimate where it is close enough.
You add your charges
Labour, transport and margin. The totals, the per-kW figure and the GST follow.
It becomes a contract
Approve it and the milestone schedule, the warranty and the payment terms are drafted from it.
The lines nobody remembers to quote
Modules and inverters are the easy part. What eats a margin is the sealant, the walkway, the surge protection and the cleaning kit — the lines that go missing from a spreadsheet.
- Anchors, ballast and clamps matched to the mounting method, not a generic set
- DC and AC cable measured along the actual run, not assumed per kW
- Surge protection, earthing, net-metering material and safety kit, every time
- Amounts you can edit, that survive a reload rather than regenerating
- Stock check against your warehouse before you order anything
- The per-kW figure, before and after subsidy, as you type
Layout
Panel count and mounting method
Bill generated
Every line, with amounts
Priced
Against catalogue or your rates
Stock checked
What you hold, what you need
Contract
With the milestone schedule
What EPCs ask about the bill
Mostly about editing, pricing and what it exports.
Something not answered here?
Talk to usOne account, all of it
These are not separate products. They are the stages of the same job, and they hand off to each other.