Not just modules and inverters. The anchors, the ballast, the sealant and the consumables — the lines a project stalls without, generated from the layout you drew.

Start free See the plans
What it does

Thirty categories, not four

A bill that lists panels, inverters, structure and 'miscellaneous' is a bill nobody priced.

Generated from the layout

Panel count, cable runs and clamp counts come from the roof you traced, not from a template you edit every time.

Hardware by mounting method

A tile roof needs hooks, a standing seam needs clamps that never penetrate, a ballasted frame needs blocks. The bill knows which.

Priced against the catalogue

Pick a Trade Partner product against a line and the rate, the brand and the specification come with it.

Your margin, your charges

Labour, transport, and margin as a percentage or a flat amount — with GST worked out line by line.

Checked against your shelf

What you already hold in your own depots against what the bill needs, so you only buy the shortfall.

Straight into a contract

Approve the bill and a contract is drafted from it, with the payment schedule you set and the warranty terms you use.

A sample bill

What a 14 kWp rooftop comes to

Twenty-two lines, generated from a traced roof. The ones marked estimated are where no Trade Partner lists the part yet.

Materials

22 lines from a 14.3 kWp RCC rooftop

On-grid · three phase
CategorySpecificationQtyRate ₹GST %Amount ₹
Solar Modules550 Wp · Mono PERC Half-Cut · 2280×1130 mm26 nos11,800123,06,800
Inverters15 kW · String · three phase · 2 MPPT1 nos92,0001292,000
Mounting StructureRCC flat roof, hot-dip galvanised, 15° tilt1 nos4,200184,200
Module ClampsSS304 mid and end clamps with bolts26 nos165184,290
Anchors & FastenersChemical anchor, M12 with adhesive52 nos95184,940
Ballast & WeightsPrecast concrete block, 40 kg26 nos320188,320
Mounting Clamps & HooksEPDM pad under base plate52 nos22181,144
DC Cables4 sq mm, tinned copper, UV resistant180 nos42187,560

Charges & margin

Materials₹5,48,869
Labour and installation₹68,000
Margin at 15%₹92,530
GST₹87,108

Grand total

₹7,96,508

₹55,700 per kW

A sample bill, with typical rates. In the studio the amounts come from the roof you traced and the rates from the Trade Partners you pick, and every line is yours to edit.

How it works

From a layout to a priced bill

Four steps, and the first two happen on their own.

01

It generates

Every line the design implies, with amounts worked from the roof and the mounting method.

02

You price it

Pick catalogue products against the lines that matter, or leave the estimate where it is close enough.

03

You add your charges

Labour, transport and margin. The totals, the per-kW figure and the GST follow.

04

It becomes a contract

Approve it and the milestone schedule, the warranty and the payment terms are drafted from it.

Why it matters

The lines nobody remembers to quote

Modules and inverters are the easy part. What eats a margin is the sealant, the walkway, the surge protection and the cleaning kit — the lines that go missing from a spreadsheet.

  • Anchors, ballast and clamps matched to the mounting method, not a generic set
  • DC and AC cable measured along the actual run, not assumed per kW
  • Surge protection, earthing, net-metering material and safety kit, every time
  • Amounts you can edit, that survive a reload rather than regenerating
  • Stock check against your warehouse before you order anything
  • The per-kW figure, before and after subsidy, as you type
See sourcing

Layout

Panel count and mounting method

Bill generated

Every line, with amounts

Priced

Against catalogue or your rates

Stock checked

What you hold, what you need

Contract

With the milestone schedule

Questions

What EPCs ask about the bill

Mostly about editing, pricing and what it exports.

Something not answered here?

Talk to us

Every line. Change a count or a rate and it stays changed — the bill is saved with the design rather than regenerated each time you open it.

From the Trade Partner product you pick against a line. Where no product is picked, the line carries a typical rate marked as an estimate so you can see which figures are real.

Line by line, at the rate each category carries — 12% on modules, 18% on most of the rest. The summary separates the material, the charges and the tax.

Yes, and you can delete the ones a job does not need. The generated bill is a starting point, not a locked document.

It matches each line against your own warehouse inventory by category and tells you what is on hand, what is already reserved and what the shortfall is.

Yes. It also carries into the proposal and into quote requests, so the customer and the Trade Partners are reading the same bill you are.